13 November 2015, Lagos – The Nigerian Ports Authority, NPA, has blamed the delay in the dredging of the channel leading to the port in Warri, Delta State, to the low level of the river which makes the siltation (rate of return of sand to the channel after dredging) level very high. Managing Director of […] More »
Why Warri port channel can’t be dredged now— NPA
Reviewed by Crude Oil Facilitators
on
17:13
Rating:
No comments:
Post a Comment